Electric ferries and port charging: how ships plug in

Battery electric ferries recharge at each berth in minutes, using automated plugs, charging arms or robots that deliver from about 1.4 MW to 15 MW per charger. Battery sizes range from about 1 MWh on Norway's Ampere (2015) to more than 41 MWh on China Zorrilla, the largest battery ship in service since October 2026.

Largest battery ship
China Zorrilla, more than 41 MWh (Corvus Energy), in service October 2026
Source
First battery electric car ferry
Ampere, Norled, Lavik to Oppedal, February 2015, 1,090 kWh
Source
Bastø Electric
4.3 MWh battery, charging up to 7.2 MW, Moss to Horten since 2021
Source
MCS for vessels
Parallel MCS connections up to 12 MW for commercial and large vessels
Source
Low voltage shore connection standard
IEC/IEEE 80005-3:2025 covers ships needing up to 1 MVA at berth
Source
Electric tug Sparky
2,800 kWh battery, 70 tonnes bollard pull, about two hours to recharge
Source
What battery electric and hybrid ferries are

What battery electric and hybrid ferries are

A battery electric ferry runs entirely on energy stored in onboard lithium ion batteries. It recharges from the shore grid while it berths, so it burns no fuel and produces no exhaust at sea or in port.

A hybrid ferry combines batteries with diesel or dual fuel engines. The batteries handle peak loads, manoeuvring and port stays, while the engines cover the open sea leg and recharge the batteries underway.

The choice depends on route length, crossing frequency and grid access. Short, frequent crossings with predictable dwell times suit full battery operation. Longer or less predictable routes usually start with hybrid systems and add battery capacity over time.

Notable electric and hybrid ferries in service

Notable electric and hybrid ferries in service

Norway's Ampere opened the sector in February 2015 on the Lavik to Oppedal crossing of the Sognefjord. Norled reports that one crossing uses only 150 to 200 kWh and that the ship saves about one million litres of diesel and more than 570 tonnes of CO2 a year.

Scale has grown quickly since. Bastø Fosen's Bastø Electric entered service on the Moss to Horten route in 2021 with a 4.3 MWh battery, 200 cars and 600 passengers. Ærø Municipality's Ellen carries the same battery size on a 22 nautical mile route between Søby and Fynshav.

The largest battery ship in service is China Zorrilla, built by Incat in Hobart for Buquebus. It carries more than 2,100 passengers and 225 vehicles across the Río de la Plata on a battery system of more than 41 MWh supplied by Corvus Energy. It entered commercial service in October 2026.

Hybrids now operate on Europe's busiest short sea routes. P&O Ferries' double ended P&O Pioneer on Dover to Calais carries up to 8.8 MWh of batteries alongside four diesel engines.

VesselOperatorRouteBattery (MWh)TypeYear
AmpereNorledLavik to Oppedal, Norway1.09Battery electric2015
Tycho Brahe and AuroraForSeaHelsingborg to Helsingør4.16 eachBattery electric (conversion)2018
Stena JutlandicaStena LineGothenburg to Frederikshavn1.0Hybrid (retrofit)2018
EllenÆrø MunicipalitySøby to Fynshav, Denmark4.3Battery electric2019
Bastø ElectricBastø FosenMoss to Horten, Norway4.3Battery electric2021
P&O PioneerP&O FerriesDover to Calais8.8Hybrid2023
China ZorrillaBuquebusBuenos Aires to Colonia del Sacramento41+Battery electric2026
How ferries charge in port

How ferries charge in port

Ferries charge during the minutes they spend loading and unloading. The connection must therefore be fast, automatic and safe in all weather and at every tide.

Three main methods are in use. Automated plug in systems move a shore cable to a socket on the hull; Bastø Electric uses a Stemmann system with a charging unit on each side of the ship and a vacuum coupling. Charging arms and towers reach down from the quay or ramp; Ellen's arm sits on the shore ramp and follows the tide while cars load. Robotic connectors use sensors to find the socket; ABB's shore stations for ForSea's two ferries use an industrial robot guided by 3D laser scanning.

Charging power has risen with battery size. Bastø Electric charges at up to 7.2 MW. China Zorrilla's terminals each have two 15 MW chargers, sized to restore the battery between each of four daily crossings.

Charging standards for ships: IEC/IEEE 80005, ISO 15118-20 and MCS

Charging standards for ships: IEC/IEEE 80005, ISO 15118-20 and MCS

Ship charging draws on two families of standards. The first is shore connection, built for ships that plug in to run hotel loads at berth. IEC/IEEE 80005-1 covers high voltage shore connection, and IEC/IEEE 80005-3:2025, published in December 2025, covers low voltage shore connection for ships needing up to 1 MVA.

The second family comes from road transport. The Megawatt Charging System (MCS), driven by the CharIN industry association, defines conductive DC charging at up to 3,000 A, with the connector formalised as IEC TS 63379. SAE published its MCS guidance as SAE J3271 in March 2025, aimed at heavy trucks and buses.

MCS matters to ports because one connector type could serve harbour craft, small ferries and electric port vehicles. CharIN states that parallel MCS connections can deliver up to 12 MW for commercial and large vessels. It names ISO 15118-20 as the communication basis for marine MCS and CCS charging.

Marine MCS is not yet a settled maritime standard. CharIN launched a Task Force Marine in June 2025 to map charging needs across ferries, tugs, workboats and barges. Large ferries today mostly use project specific AC or DC solutions. Port owners should specify interoperability early and track IEC work before fixing connector choices.

Grid capacity and battery buffers

Grid capacity and battery buffers

A ferry that charges at several megawatts for ten minutes places a sharp, repeated load on the local grid. Many ferry quays sit on weak rural networks that were never designed for this.

The common answer is a shore battery buffer. The buffer charges slowly from the grid between calls and discharges quickly into the ship when it berths. Norled installed battery buffers on both berths for Ampere because the grid at Lavik and Oppedal had limited capacity.

Larger projects need new grid capacity as well. Uruguay's state utility UTE installed a new grid cable to supply China Zorrilla's terminal. Port planners should engage the grid operator at the concept stage, because grid reinforcement often takes longer than building the ship.

Electric tugs and harbour craft

Electric tugs and harbour craft

Tugs suit electrification because they work short jobs close to a fixed base and return to the same berth to charge. Their peak power is high, but average energy use per job is modest.

Ports of Auckland took delivery of Sparky, a Damen RSD-E Tug 2513, in 2022. It has a 2,800 kWh battery, 70 tonnes of bollard pull, and recharges in about two hours from a quayside connection of around 1,400 kW. It can complete two or more assignments between charges.

Pilot boats, crew transfer vessels, workboats and harbour ferries follow the same logic. These are the vessels where a common MCS style connector would give ports the most benefit.

Costs and payback

Costs and payback

Battery ferries cost more to build but less to run. The extra capital goes on batteries, lighter hulls, shore chargers and grid connections. Savings come from lower energy costs, simpler maintenance and the absence of fuel.

A 2015 feasibility study published by Siemens estimated that 84 of Norway's ferries could switch to full battery operation for about €384 million of extra investment. It put the resulting operating savings at about €77 million a year, on top of avoided emissions.

Shore infrastructure is a large share of the bill on big projects. China Zorrilla's chargers cost about US$14 million, and the new Uruguayan grid cable about US$20 million. Payback therefore depends on local power prices, crossing frequency, contract length and who funds the shore side.

EU rules strengthen the case. The EU ETS and FuelEU Maritime place a growing cost on fossil fuel burned by ships of 5,000 GT and above. Electricity drawn from shore produces no emissions on board, so it carries no ETS allowance cost.

FAQ

Questions, answered

What is the largest battery electric ferry?+

China Zorrilla, built by Incat for Buquebus, carries a battery system of more than 41 MWh supplied by Corvus Energy. It entered commercial service between Argentina and Uruguay in October 2026.

What was the first battery electric car ferry?+

Norled's Ampere entered service on the Lavik to Oppedal route in Norway in February 2015. Its battery system is rated at 1,090 kWh.

How long does an electric ferry take to charge?+

Short route ferries charge while they load at each berth. Ampere needs about ten minutes at each pier, and Ellen charges in about 20 minutes at Søby.

How much power does an electric ferry need to charge?+

Charging power ranges from about 1.4 MW for the electric tug Sparky to 7.2 MW for Bastø Electric. China Zorrilla's terminals each have two 15 MW chargers.

Can ships use the Megawatt Charging System?+

Yes, for smaller vessels and harbour craft. CharIN states that parallel MCS connections can deliver up to 12 MW for vessels, but marine MCS is still being defined through its Task Force Marine and IEC work.

What is the difference between shore power and ferry charging?+

Shore power supplies a ship's hotel loads at berth under IEC/IEEE 80005 standards. Ferry charging refills the propulsion batteries, usually at higher power and in a shorter window.

Why do ports install battery buffers for electric ferries?+

A buffer charges slowly from a weak grid and then delivers power quickly to the ship. It avoids costly grid reinforcement and smooths peak demand.

Related guides
Sources
  1. Norled: MF Ampere marks its 10th anniversary
  2. Corvus Energy: MF Ampere success story
  3. Riviera: Bastø Electric technical details
  4. Danfoss: Ellen battery and charging
  5. Ellen (E-ferry) reference entry
  6. ChargedEVs: Corvus Energy 41 MWh system enters service on China Zorrilla
  7. China Zorrilla (ship) reference entry
  8. Riviera: P&O Ferries takes delivery of P&O Pioneer
  9. ABB: ForSea completes conversion of battery ferries
  10. Northvolt: Hybrid and battery ferries at Stena Line
  11. CharIN: Electrification of the marine sector
  12. CharIN: AC or DC charging for marine vessels
  13. ISO: IEC/IEEE 80005-3:2025 Low voltage shore connection systems
  14. SAE J3271_202503 Megawatt Charging System for Electric Vehicles
  15. Sustainable Ships: Damen's Sparky full electric tug
  16. Maritime Executive: Ampere in operation (charging time, shore buffers)
  17. Siemens: Electric operation study, Norway ferries (2015)

Figures are checked against the regulation text and official sources listed above. Spotted something out of date? Write to media@dtfconference.com.

DTF 2027

Meet the ports, shipping lines and utilities delivering this in 2027.

Latest related news6
Rendering of one of Molslinjen's three battery electric fast catamarans at seaElectric vessels
AYK Energy wins record battery contract: 165 MWh for Molslinjen's three electric fast ferriesAYK Energy will supply 165 MWh of batteries for three Incat built electric fast ferries for Molslinjen, after cutting battery weight to under 400 tonnes.16 Nov 2026
HELENUS project team with a Genevos solid oxide fuel cell moduleElectric vessels
Genevos and HELENUS: solid oxide fuel cells aim at cruise ship power and heatGenevos is building modular solid oxide fuel cells for cruise ships in HELENUS, an EU project with a 200 kW demonstrator that runs to June 2027.16 Nov 2026
The hybrid tour boat El Escudo passing the container ship Ever Match at the Port of Los AngelesElectric vessels
Los Angeles and Long Beach mark 20 years of the Clean Air Action Plan aboard hybrid harbour boat El EscudoLos Angeles and Long Beach mark 20 years of the Clean Air Action Plan on 2 December with a harbour tour aboard El Escudo, a hybrid tour boat.14 Nov 2026
High voltage shore connection cable running to a ship at the Port of San DiegoShore power
COP31: maritime coalition sets 20% electrification goal for shipping by 2035, shore power countedMore than 30 maritime groups backed a COP31 goal for electricity to supply 20% of international shipping's energy by 2035, with shore power counted.12 Nov 2026
The Hyke F-15 Shuttle battery electric passenger ferry on the river in Fredrikstad, NorwayIndustry
Hyke F-15 Shuttle used 10 to 12 kWh an hour in 14 month Fredrikstad ferry pilotHyke's F-15 Shuttle used 10 to 12 kWh an hour over 14 months in Fredrikstad, against an estimated 60 to 80 kWh for diesel, and charges at 150 kW.10 Nov 2026
Port Pulse 02 results: 50% say ports should plan ferry charging berth by berth, 35% ports, operators and grid route by route, 15% Brussels, 0% member statesShore power
Who maps the charger for the ferry? Half the industry says the portHalf of DTF Port Pulse voters say ports should plan ferry charging berth by berth. Not one voter backed national plans, the tool AFIR relies on.8 Nov 2026