We use cookies to measure and improve DTF.

decarbonising
the future.
Terminals at the Port of Barcelona

PortFocus Barcelona · Day 1 · Wednesday 24 February 2027

live shore
power.

18:30 to 19:30 · Grimaldi Terminal, Port of Barcelona

A ferry at berth switches off its engines and connects to the grid while you watch from the quay. Then a full conference day with the Port of Barcelona.

See the programme

see it working.

Most shore power is discussed on slides. On Day 1 of PortFocus, guests watch it happen: the cable, the connection and the moment a ship at berth stops burning fuel and runs on the grid.

The connection takes place at the Grimaldi Terminal, one of the Port of Barcelona's operating shore power systems, after a boat tour of the port. It is subject to the vessel schedule on the day.

Want to know the basics first? Read the DTF shore power guide.

    Day 1 timeline

  • 16:30Meeting pointWorld Trade Center Barcelona, Moll de Barcelona.
  • 17:00 to 18:00Boat tour of the Port of BarcelonaPast the container, ferry and cruise terminals the port is electrifying. 40 places.
  • 18:00 to 18:30Transfer to the Grimaldi Terminal
  • 18:30 to 19:30Live shore power connectionA ferry at berth switches off its engines and connects to the grid, at one of the port's operating shore power systems.
  • 20:30Dinner near the portSpeakers, partners and guests. Venue to be confirmed.

Why Barcelona

a port already plugged in.

2024

Barcelona's first onshore power system opened, at the BEST container terminal

4,000+

Tonnes of CO₂ saved in the first year of ferry shore power

80 MW

Grid connection secured for the electrified quays under Nexigen

Source: Port of Barcelona. More on the port on the PortFocus Barcelona page.

questions.

When is the live shore power connection?+

On Wednesday 24 February 2027, from 18:30 to 19:30 at the Grimaldi Terminal in the Port of Barcelona, as part of Day 1 of DTF PortFocus Barcelona.

What will guests see?+

A ferry at berth switching off its engines and taking its power from the grid through the terminal's shore power system, followed from the quay.

Is the connection guaranteed?+

It depends on the vessel schedule on the day. If the schedule changes, the programme will say so ahead of the event.

Who can attend?+

PortFocus Barcelona guests. The event is limited to 100 people and the boat tour before the connection to 40.

What is shore power?+

Shore power, also called onshore power supply (OPS) or cold ironing, lets a ship switch off its auxiliary engines at the berth and run on electricity from the grid.

100 places. 40 on the boat.